Instruction
i have new assignment if you can do it for me please.
I need you to make a daily log report as a short paragraph of at least 3 sentences starting from Dec 13/2016 to Jan 20/2017.so the total of reports should be (25 report without the off day Friday and saturday). The daily log must include:
1- Date
2- Detailed description of what I did on the job site (the short paragraph).
3- Number of hours worked for each documentation (total of 200 hours) divided as the following:
1. Prepare engineer drawings (50 hours):
* Take customer specifications.
* Work with engineer on stress or strain.
* Provide final set of prints.
2. Fabrication of sings (70 hours):
* Acquire raw material and skills techniques.
* Learning methods of cutting and burning, metal forming, machining, welding and final assembly.
3. Understand the process of metal coatings (70 hours):
* Metal cutting and/or forming process, metal cleaning (rinsing and bathing).
* Chemical conversion coating, anodizing, plating, electroplating and painting.
4. Begin to understand Marthiting Products:
* Learn clientel base.
* Specify customer need.
* Create marketing for a given population.
see the picture for example