Instruction
I need to estimate part of the capstone project, I should have to spread sheets. One is for the take off sheet and the other one for the cost sheet.
My part is to estimate the following:
DIVISION 08 - OPENINGS
Section 081113 Hollow Metal Doors and Frames
Section 081416 Flush Wood Doors
Section 083113 Access Doors and Frames
Section 083316 Overhead Coiling Grilles
Section 083700 Canopy Tilt-up Doors
Section 084113 Aluminum-Framed Entrances and Storefronts
Section 084126 All-Glass Entrances and Storefronts
Section 084413 Glazed Aluminum Curtain Walls
Section 087100 Door Hardware
Section 087113 Automatic Door Operators
Section 088000 Glazing
Section 088300 Mirrors
DIVISION 10 - SPECIALTIES
Section 101100 Visual Display Surfaces
Section 101400 Signage
Section 101419 Dimensional Letter Signage
Section 101426 Post and Panel/Pylon Signage
Section 102113 Toilet Compartments
Section 102226 Sliding Partition
Section 102238 Operable Glass-Panel Partitions
Section 102600 Wall and Door Protection
Section 102800 Toilet, Bath, and Laundry Accessories
Section 103100 Manufactured Fireplaces
Section 104413 Fire Extinguisher Cabinets
Section 104416 Fire Extinguishers
Section 106500 Automatic Vertically Folding Acoustical Walls
DIVISION 11 EQUIPMENT
Section 111320 Projection Screens
DIVISION 12 FURNISHINGS
Section 122413 Roller Window Shades
Section 129300 Site Furnishings